References

Glass facade delivery to Saint Petersburg
In close cooperation with RUSSIA Fachspedition Dr. Lassmann, RFL Logistik handled the transport and the import clearance of facade elements for a business premises in the city center of Saint Petersburg. In 2010 a total of 70 truckloads were shipped directly from Italy to Saint Petersburg.
For the project, which was carried out over a ten month period, RFL Logistik provided the following services: In addition to the optimal dispatching and the import clearance in Russia RFL Logistik properly prepared all required documents (GOST-R certificates and all special permissions to enter the city center of Saint Petersburg) guaranteeing a trouble-free transport and an on-time delivery.
 
Hotel Baltschug Kempinski Moscow
RUSSIA Fachspedition Dr. Lassmann GmbH transported various building materials for the construction of the 'Hotel Baltschug Kempinski' in Moscow. During the construction period of three years, around 1,200 truckloads were shipped safely to the Russian capital.
 
 
Human Centrifuge Moscow
RUSSIA Fachspedition Dr. Lassmann GmbH conducted the transport of a human centrifuge for the Russian space program to Moscow. The delivery included two shiploads from Germany to Moscow. There, the parts were transshiped and the post haulage was conducted with a special trailer and a barge. According to a specific project plan, the storage took place at a large aircraft hangar. The heaviest single package weighed around 160 tons.
 
Headquarters of Sberbank
Sberbank is the largest bank in Russia and Eastern Europe - as well as being the third largest in Europe. For the construction of the company's headquarters in Moscow, around 300 loads of various building equipment as well as facade materials were transported to Moscow.